$18.7 Million Western Beltway Trail Upgrade Opens: New Tunnels Let Cyclists Skip Charleston Traffic

$18.7 Million Western Beltway Trail Upgrade Opens: New Tunnels Let Cyclists Skip Charleston Traffic (file photo)

Cyclists, runners and walkers on the west side of the valley no longer have to dash across eight lanes of Charleston Boulevard to stay on the 215 trail. Clark County has finished an $18.7 million safety project on the CC-215 Western Beltway Trail, and officials will mark the milestone with a ribbon-cutting at 8 a.m. Thursday, Nov. 19, at the northwest corner of West Charleston Boulevard and the beltway, 8 News Now reported.

Key Takeaways

  • The $18.7 million project, funded by the Regional Transportation Commission, is complete.
  • New undercrossing tunnels at Charleston Boulevard carry trail users beneath traffic instead of across it.
  • A new 1,635-foot stretch of trail links the existing path south of Peace Way to the segment north of Fort Apache Road.
  • The result is a continuous trail connection through the southwest Las Vegas Valley.
  • A public ribbon-cutting is set for 8 a.m. Thursday at West Charleston and the 215.

What was built

The centerpiece is a set of undercrossing tunnels at Charleston Boulevard. Before, anyone riding or walking the beltway trail had to leave the path and use the surface crosswalk at one of the widest, busiest intersections on the west side. Now they can pass underneath without ever meeting a car.

Crews also built a new 1,635-foot piece of multi-use trail that closes a gap between the section south of Peace Way and the section north of Fort Apache Road. According to 8 News Now, that addition creates an unbroken trail through the southwest part of the valley.

Why the county says it matters

Commissioner Justin Jones told FOX5 in September, while the work was underway, that the project would end the days of crossing eight lanes of traffic on Charleston at the 215, calling it a game changer for cyclists. Critics at the time argued the money was not needed because trail users could already use signalized crosswalks at Fort Apache, Peace Way and Charleston. Jones answered that the spending is about keeping people safe on the roads.

Commissioners April Becker and Justin Jones are expected at Thursday morning’s event, along with Clark County Public Works, contractor Las Vegas Paving and local business leaders.

What it means for locals and visitors

For west-side residents in Summerlin and the southwest valley, the upgrade makes the beltway trail a more practical route for commuting, training rides and family outings, with fewer stops and less exposure to traffic. Drivers on Charleston near the 215 should also see fewer bikes and pedestrians in the crosswalks. Visitors who bring or rent a bike can use the beltway trail as a long, mostly car-free route around the western edge of the valley. Expect some extra activity near West Charleston and the 215 around 8 a.m. Thursday during the ceremony.

Coming to Vegas? Practice craps, roulette, blackjack, baccarat and slots for free on our casino simulator before you play for real.

Sources

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *